logo
Hongkong Yaning Purification industrial Co.,Limited violaquan@dgync.com 86--18373128025
Hongkong Yaning Purification industrial Co.,Limited Company Profile
News
Home > News >
Company News About Modular Glass Wall Operating Room System Achieves ISO 7 Cleanliness Without Site Welding Or Demolition

Modular Glass Wall Operating Room System Achieves ISO 7 Cleanliness Without Site Welding Or Demolition

2026-11-13
Latest company news about Modular Glass Wall Operating Room System Achieves ISO 7 Cleanliness Without Site Welding Or Demolition

Modular Glass Wall Operating Rooms Reach ISO 7 Without Site Welding

Concrete operating rooms take months, cannot be expanded, and hide every cable behind a wall you have to break to service. YANING's modular glass wall operating room system replaces that with a prefabricated enclosure assembled from flush glazed panels, achieving ISO 7 (Class 10000) cleanliness in days rather than months, with full visual transparency for clinical supervision.

The Engineering Choices Behind The Glass

  • Flush glazed panels - 6mm toughened glass bonded into aluminium frames with no external screw heads, eliminating dust ledges and making disinfection a single wipe
  • Double seal joints - EPDM gasket plus silicone bead on both faces, tested to hold room pressure at 15-25 Pa
  • Integrated service void - 100mm cavity carries medical gas, data and power without surface trunking
  • Seamless ceiling grid - laminar flow plenum and lighting sit in one plane, no overlapping frames
  • Sliding or hermetic swing doors - with foot sensor, interlock option and vision panel

Performance Benchmarks

ParameterValueTest Method
CleanlinessISO 7 (Class 10000), ISO 6 on requestISO 14644-1 particle count
Room pressure+15 to +25 Pa positive, -10 to -25 Pa negativeCalibrated differential gauge
Air change rate25-40 ACHBalometer at supply diffusers
Airborne recoveryUnder 15 minutes to ISO 7ISO 14644-3 recovery test
LeakageUnder 0.5% of room volume per hourPressure decay test
Airtightness of glazingNo measurable infiltration at 30 PaSmoke pencil walk test

Where It Fits Best

Hospital refurbishment inside a live building is the strongest case: panels arrive flat packed, pass through a standard 900mm lift door, and are assembled in a corridor without demolition dust. The same system serves ophthalmic suites, hybrid catheterisation labs, dental surgical rooms and veterinary operating theatres, and it can be dismantled and reconfigured when a department is redesigned.

Expansion Without Closure

Because the enclosure is bolted rather than welded, a two-room suite can become a four-room suite by adding panel bays at a weekend, with no wet trades and no fire watch permits. Two hospitals in Southeast Asia have already used this to convert a single theatre into a three-theatre block while keeping one room operational throughout.

Service Access Without Breaking The Wall

Every panel bay can be released with a single tool, so a failed gas outlet or a jammed door closer is repaired from the corridor side without dismantling glazing or shutting the theatre. Spare gaskets, panel clips and a door roller set ship with each project as a standard commissioning kit.

Tell us your room dimensions and required cleanliness class and we will return a glass wall layout with door swing, service void routing and a panel-by-panel installation sequence.

Events
Contacts
Contacts: Miss. Viola
Fax: 86-0769-85419534
Contact Now
Mail Us