2026/11/13
YANING Launches One-Stop Cleanroom And Operating Room Delivery Model Covering Design To Commissioning
.gtr-container-x7k2m {
font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif;
font-size: 14px;
line-height: 1.6;
color: #2b2f33;
padding: 20px 16px;
box-sizing: border-box;
max-width: 100%;
}
.gtr-container-x7k2m * {
box-sizing: border-box;
}
.gtr-container-x7k2m .gtr-h2-x7k2m {
font-size: 18px;
font-weight: bold;
color: #5c7a12;
margin: 0 0 16px 0;
padding: 0 0 10px 0;
border-bottom: 2px solid #96BF26;
line-height: 1.4;
}
.gtr-container-x7k2m .gtr-h3-x7k2m {
font-size: 16px;
font-weight: bold;
color: #6f9415;
margin: 24px 0 12px 0;
padding-left: 10px;
border-left: 4px solid #96BF26;
line-height: 1.4;
}
.gtr-container-x7k2m p {
font-size: 14px;
text-align: left;
line-height: 1.6;
margin: 0 0 14px 0;
color: #3a3f44;
}
.gtr-container-x7k2m ul {
list-style: none !important;
margin: 0 0 16px 0;
padding: 0;
}
.gtr-container-x7k2m ul li {
position: relative;
padding: 8px 12px 8px 24px;
margin: 0 0 8px 0;
font-size: 14px;
line-height: 1.6;
color: #3a3f44;
border-left: 3px solid #d9e8b0;
border-radius: 0 6px 6px 0;
transition: border-color 0.2s ease, background-color 0.2s ease;
}
.gtr-container-x7k2m ul li::before {
content: "•" !important;
position: absolute !important;
left: 8px !important;
top: 8px;
color: #96BF26;
font-weight: bold;
font-size: 16px;
line-height: 1.6;
}
.gtr-container-x7k2m ul li:hover {
border-left-color: #96BF26;
background-color: #f7faf0;
}
.gtr-container-x7k2m ul li strong {
color: #5c7a12;
font-weight: bold;
}
.gtr-container-x7k2m .gtr-table-wrap-x7k2m {
width: 100%;
overflow-x: auto;
margin: 0 0 18px 0;
border-radius: 8px;
box-shadow: 0 2px 10px rgba(150, 191, 38, 0.12);
}
.gtr-container-x7k2m table {
width: 100%;
border-collapse: collapse !important;
border-spacing: 0 !important;
border: 1px solid #c5d99a !important;
font-size: 14px;
min-width: 520px;
}
.gtr-container-x7k2m table th {
background-color: #96BF26 !important;
color: #ffffff !important;
font-weight: bold !important;
font-size: 14px !important;
text-align: left !important;
padding: 10px 12px !important;
border: 1px solid #86ab22 !important;
line-height: 1.5;
word-break: normal !important;
}
.gtr-container-x7k2m table td {
padding: 10px 12px !important;
border: 1px solid #dbe7c2 !important;
text-align: left !important;
font-size: 14px !important;
color: #3a3f44 !important;
line-height: 1.5;
vertical-align: top;
word-break: normal !important;
overflow-wrap: break-word;
}
.gtr-container-x7k2m table tr:nth-child(even) td {
background-color: #f7faf0 !important;
}
.gtr-container-x7k2m table tr:hover td {
background-color: #eef5dc !important;
}
@media (min-width: 768px) {
.gtr-container-x7k2m {
padding: 32px 40px;
max-width: 900px;
margin: 0 auto;
}
.gtr-container-x7k2m .gtr-h2-x7k2m {
font-size: 18px;
margin-bottom: 20px;
}
.gtr-container-x7k2m .gtr-h3-x7k2m {
font-size: 16px;
margin: 28px 0 14px 0;
}
.gtr-container-x7k2m table {
min-width: 0;
}
}
From Empty Shell To Certified Clean Space: One Contract, One Team
Cleanroom and operating room projects usually fail at the seams, not in the middle. The panel supplier blames the HVAC contractor, the HVAC contractor blames the FFU vendor, and the hospital or pharma client ends up coordinating four companies in three languages while the commissioning date slips. YANING now delivers cleanrooms and operating rooms as a single turnkey package: one contract, one project manager, one commissioning report.
What "One-Stop" Actually Covers
Feasibility and layout design - room drawings, pressure cascade, personnel and material flow, equipment load calculation
3D proposal in 24 hours - a walkable model with panel joint details, FFU layout and door positions
In-house manufacturing - 50mm sandwich panels, airtight doors, HEPA filter boxes, FFU units, laminar flow ceilings and stainless steel benches
MEP coordination - HVAC ducting, electrical, medical gas routing and control cabling interfaces
On-site installation guidance - numbered panel sequence plus remote engineering supervision
Commissioning and handover - particle count, air velocity, pressure differential and recovery time testing
Delivery Timeline For A Typical 200 Square Meter Project
PhaseDurationDeliverable
Design and 3D proposal3-5 daysLayout drawings, equipment schedule, quotation
Panel and equipment production18-25 daysNumbered panels, doors, FFU, filters, controls
Shipping7-20 daysContainer loading plan, packing list, customs documents
Erection10-15 daysEnclosure complete, doors aligned, lighting live
Commissioning3-5 daysTest report, as-built drawings, O&M manual
Why Buyers Ask For It
Pharmaceutical clients need a single responsible party for GMP documentation. Hospital groups need one warranty contact when a pressure alarm triggers at 2 a.m. Distributors need a supplier who can quote a full operating room suite instead of selling panels by the square meter. The turnkey model removes the interface risk that usually sits with the buyer.
Interfaces We Refuse To Leave Open
Every project handover includes a signed interface matrix covering eleven boundaries: panel to floor, panel to ceiling grid, door to wall, FFU to duct, filter box to ceiling, air shower to partition, pass box to wall, medical gas outlet to panel, light to ceiling, sensor to controller, and controller to building management system. If a boundary is not listed, it is not a hidden extra.
Send us a floor plan or even a hand sketch, and our engineering team will return a pressure cascade scheme, an equipment list and a budget range within one working day. That is the fastest way to test whether a one-stop partner fits your project.
Read more