logo
Hongkong Yaning Purification industrial Co.,Limited violaquan@dgync.com 86--18373128025
Hongkong Yaning Purification industrial Co.,Limited Company Profile
News
Home >

Hongkong Yaning Purification industrial Co.,Limited Company News

Lastest company news about YANING Launches One-Stop Cleanroom And Operating Room Delivery Model Covering Design To Commissioning 2026/11/13
YANING Launches One-Stop Cleanroom And Operating Room Delivery Model Covering Design To Commissioning
.gtr-container-x7k2m { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; font-size: 14px; line-height: 1.6; color: #2b2f33; padding: 20px 16px; box-sizing: border-box; max-width: 100%; } .gtr-container-x7k2m * { box-sizing: border-box; } .gtr-container-x7k2m .gtr-h2-x7k2m { font-size: 18px; font-weight: bold; color: #5c7a12; margin: 0 0 16px 0; padding: 0 0 10px 0; border-bottom: 2px solid #96BF26; line-height: 1.4; } .gtr-container-x7k2m .gtr-h3-x7k2m { font-size: 16px; font-weight: bold; color: #6f9415; margin: 24px 0 12px 0; padding-left: 10px; border-left: 4px solid #96BF26; line-height: 1.4; } .gtr-container-x7k2m p { font-size: 14px; text-align: left; line-height: 1.6; margin: 0 0 14px 0; color: #3a3f44; } .gtr-container-x7k2m ul { list-style: none !important; margin: 0 0 16px 0; padding: 0; } .gtr-container-x7k2m ul li { position: relative; padding: 8px 12px 8px 24px; margin: 0 0 8px 0; font-size: 14px; line-height: 1.6; color: #3a3f44; border-left: 3px solid #d9e8b0; border-radius: 0 6px 6px 0; transition: border-color 0.2s ease, background-color 0.2s ease; } .gtr-container-x7k2m ul li::before { content: "•" !important; position: absolute !important; left: 8px !important; top: 8px; color: #96BF26; font-weight: bold; font-size: 16px; line-height: 1.6; } .gtr-container-x7k2m ul li:hover { border-left-color: #96BF26; background-color: #f7faf0; } .gtr-container-x7k2m ul li strong { color: #5c7a12; font-weight: bold; } .gtr-container-x7k2m .gtr-table-wrap-x7k2m { width: 100%; overflow-x: auto; margin: 0 0 18px 0; border-radius: 8px; box-shadow: 0 2px 10px rgba(150, 191, 38, 0.12); } .gtr-container-x7k2m table { width: 100%; border-collapse: collapse !important; border-spacing: 0 !important; border: 1px solid #c5d99a !important; font-size: 14px; min-width: 520px; } .gtr-container-x7k2m table th { background-color: #96BF26 !important; color: #ffffff !important; font-weight: bold !important; font-size: 14px !important; text-align: left !important; padding: 10px 12px !important; border: 1px solid #86ab22 !important; line-height: 1.5; word-break: normal !important; } .gtr-container-x7k2m table td { padding: 10px 12px !important; border: 1px solid #dbe7c2 !important; text-align: left !important; font-size: 14px !important; color: #3a3f44 !important; line-height: 1.5; vertical-align: top; word-break: normal !important; overflow-wrap: break-word; } .gtr-container-x7k2m table tr:nth-child(even) td { background-color: #f7faf0 !important; } .gtr-container-x7k2m table tr:hover td { background-color: #eef5dc !important; } @media (min-width: 768px) { .gtr-container-x7k2m { padding: 32px 40px; max-width: 900px; margin: 0 auto; } .gtr-container-x7k2m .gtr-h2-x7k2m { font-size: 18px; margin-bottom: 20px; } .gtr-container-x7k2m .gtr-h3-x7k2m { font-size: 16px; margin: 28px 0 14px 0; } .gtr-container-x7k2m table { min-width: 0; } } From Empty Shell To Certified Clean Space: One Contract, One Team Cleanroom and operating room projects usually fail at the seams, not in the middle. The panel supplier blames the HVAC contractor, the HVAC contractor blames the FFU vendor, and the hospital or pharma client ends up coordinating four companies in three languages while the commissioning date slips. YANING now delivers cleanrooms and operating rooms as a single turnkey package: one contract, one project manager, one commissioning report. What "One-Stop" Actually Covers Feasibility and layout design - room drawings, pressure cascade, personnel and material flow, equipment load calculation 3D proposal in 24 hours - a walkable model with panel joint details, FFU layout and door positions In-house manufacturing - 50mm sandwich panels, airtight doors, HEPA filter boxes, FFU units, laminar flow ceilings and stainless steel benches MEP coordination - HVAC ducting, electrical, medical gas routing and control cabling interfaces On-site installation guidance - numbered panel sequence plus remote engineering supervision Commissioning and handover - particle count, air velocity, pressure differential and recovery time testing Delivery Timeline For A Typical 200 Square Meter Project PhaseDurationDeliverable Design and 3D proposal3-5 daysLayout drawings, equipment schedule, quotation Panel and equipment production18-25 daysNumbered panels, doors, FFU, filters, controls Shipping7-20 daysContainer loading plan, packing list, customs documents Erection10-15 daysEnclosure complete, doors aligned, lighting live Commissioning3-5 daysTest report, as-built drawings, O&M manual Why Buyers Ask For It Pharmaceutical clients need a single responsible party for GMP documentation. Hospital groups need one warranty contact when a pressure alarm triggers at 2 a.m. Distributors need a supplier who can quote a full operating room suite instead of selling panels by the square meter. The turnkey model removes the interface risk that usually sits with the buyer. Interfaces We Refuse To Leave Open Every project handover includes a signed interface matrix covering eleven boundaries: panel to floor, panel to ceiling grid, door to wall, FFU to duct, filter box to ceiling, air shower to partition, pass box to wall, medical gas outlet to panel, light to ceiling, sensor to controller, and controller to building management system. If a boundary is not listed, it is not a hidden extra. Send us a floor plan or even a hand sketch, and our engineering team will return a pressure cascade scheme, an equipment list and a budget range within one working day. That is the fastest way to test whether a one-stop partner fits your project.
Read more
Lastest company news about Modular Glass Wall Operating Room System Achieves ISO 7 Cleanliness Without Site Welding Or Demolition 2026/11/13
Modular Glass Wall Operating Room System Achieves ISO 7 Cleanliness Without Site Welding Or Demolition
Modular Glass Wall Operating Rooms Reach ISO 7 Without Site Welding Concrete operating rooms take months, cannot be expanded, and hide every cable behind a wall you have to break to service. YANING's modular glass wall operating room system replaces that with a prefabricated enclosure assembled from flush glazed panels, achieving ISO 7 (Class 10000) cleanliness in days rather than months, with full visual transparency for clinical supervision. The Engineering Choices Behind The Glass Flush glazed panels - 6mm toughened glass bonded into aluminium frames with no external screw heads, eliminating dust ledges and making disinfection a single wipe Double seal joints - EPDM gasket plus silicone bead on both faces, tested to hold room pressure at 15-25 Pa Integrated service void - 100mm cavity carries medical gas, data and power without surface trunking Seamless ceiling grid - laminar flow plenum and lighting sit in one plane, no overlapping frames Sliding or hermetic swing doors - with foot sensor, interlock option and vision panel Performance Benchmarks ParameterValueTest Method CleanlinessISO 7 (Class 10000), ISO 6 on requestISO 14644-1 particle count Room pressure+15 to +25 Pa positive, -10 to -25 Pa negativeCalibrated differential gauge Air change rate25-40 ACHBalometer at supply diffusers Airborne recoveryUnder 15 minutes to ISO 7ISO 14644-3 recovery test LeakageUnder 0.5% of room volume per hourPressure decay test Airtightness of glazingNo measurable infiltration at 30 PaSmoke pencil walk test Where It Fits Best Hospital refurbishment inside a live building is the strongest case: panels arrive flat packed, pass through a standard 900mm lift door, and are assembled in a corridor without demolition dust. The same system serves ophthalmic suites, hybrid catheterisation labs, dental surgical rooms and veterinary operating theatres, and it can be dismantled and reconfigured when a department is redesigned. Expansion Without Closure Because the enclosure is bolted rather than welded, a two-room suite can become a four-room suite by adding panel bays at a weekend, with no wet trades and no fire watch permits. Two hospitals in Southeast Asia have already used this to convert a single theatre into a three-theatre block while keeping one room operational throughout. Service Access Without Breaking The Wall Every panel bay can be released with a single tool, so a failed gas outlet or a jammed door closer is repaired from the corridor side without dismantling glazing or shutting the theatre. Spare gaskets, panel clips and a door roller set ship with each project as a standard commissioning kit. Tell us your room dimensions and required cleanliness class and we will return a glass wall layout with door swing, service void routing and a panel-by-panel installation sequence.
Read more
Lastest company news about Laminar Flow Ceiling Converts Standard Operating Theatre Into Verified ISO 5 Surgical Zone With H14 Filters 2026/11/13
Laminar Flow Ceiling Converts Standard Operating Theatre Into Verified ISO 5 Surgical Zone With H14 Filters
.gtr-container-a7f3k { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; font-size: 14px; color: #2c3338; line-height: 1.6; max-width: 100%; box-sizing: border-box; padding: 4px; } .gtr-container-a7f3k *, .gtr-container-a7f3k *::before, .gtr-container-a7f3k *::after { box-sizing: border-box; } .gtr-container-a7f3k .gtr-title-main { font-size: 18px; font-weight: bold; color: #1a8f5c; line-height: 1.4; margin: 0 0 16px 0; padding: 0 0 12px 0; border-bottom: 2px solid #26BF7E; } .gtr-container-a7f3k .gtr-title-sub { font-size: 16px; font-weight: bold; color: #1a8f5c; line-height: 1.4; margin: 24px 0 12px 0; padding: 0 0 0 10px; border-left: 4px solid #26BF7E; } .gtr-container-a7f3k p { font-size: 14px; text-align: left; line-height: 1.6; margin: 0 0 14px 0; color: #2c3338; } .gtr-container-a7f3k ol { list-style: none !important; margin: 0 0 16px 0; padding: 0; } .gtr-container-a7f3k ol li { position: relative; padding: 10px 12px 10px 34px; margin: 0 0 8px 0; font-size: 14px; line-height: 1.6; color: #2c3338; border: 1px solid #d6ece1; border-radius: 6px; background-color: #f7fcf9; } .gtr-container-a7f3k ol li::before { content: counter(list-item) "." !important; position: absolute !important; left: 12px !important; top: 10px; font-weight: bold; color: #26BF7E; } .gtr-container-a7f3k ol li strong { color: #1a8f5c; } .gtr-container-a7f3k .gtr-table-wrap { width: 100%; overflow-x: auto; margin: 0 0 16px 0; border-radius: 8px; box-shadow: 0 1px 4px rgba(38, 191, 126, 0.12); } .gtr-container-a7f3k table { width: 100%; border-collapse: collapse !important; border-spacing: 0 !important; border: 1px solid #26BF7E !important; font-size: 14px; margin: 0 !important; } .gtr-container-a7f3k table th { border: 1px solid #26BF7E !important; padding: 10px 12px !important; text-align: left !important; font-size: 14px; font-weight: bold; color: #ffffff; background-color: #26BF7E; white-space: normal; word-break: normal; overflow-wrap: break-word; } .gtr-container-a7f3k table td { border: 1px solid #cfe9dd !important; padding: 10px 12px !important; text-align: left !important; font-size: 14px; color: #2c3338; background-color: #ffffff; white-space: normal; word-break: normal; overflow-wrap: break-word; } .gtr-container-a7f3k table tr:nth-child(even) td { background-color: #f4fbf7; } .gtr-container-a7f3k table tr:hover td { background-color: #e6f7ee; } @media (min-width: 768px) { .gtr-container-a7f3k { padding: 8px; } .gtr-container-a7f3k .gtr-title-main { font-size: 18px; } .gtr-container-a7f3k .gtr-title-sub { font-size: 16px; } .gtr-container-a7f3k table th, .gtr-container-a7f3k table td { padding: 12px 16px !important; } } Laminar Flow Ceiling Turns A Standard Theatre Into An ISO 5 Surgical Zone Most surgical site infections are airborne before they are contact-borne. A laminar flow ceiling placed directly over the operating table delivers a unidirectional curtain of H14 filtered air at 0.45 m/s, diluting and sweeping bacteria away from the open wound. YANING supplies the full assembly: plenum, HEPA filter bank, diffuser screen, LED surgical lighting ring and the control package that keeps the zone stable. How The Zone Is Built Ceiling plenum - 600mm deep static pressure box in 1.0mm galvanised steel, powder coated, sealed with continuous gasket Filter bank - H14 HEPA filters, 99.99% at 0.3 micron, individually leak tested with PAO before shipment Diffuser screen - woven stainless mesh with 85% open area for even velocity across the whole surgical field Return path - low level wall grilles on two opposite sides create a clean-to-dirty sweep instead of turbulence Controls - differential pressure transmitter, velocity sensor and alarm tied to the theatre BMS Measured Zone Performance ParameterSpecifiedTypical Site Result Supply velocity0.45 m/s +/-20%0.43-0.47 m/s across grid Cleanliness at tableISO 5 (Class 100)ISO 5 verified at wound site Filter efficiency99.99% at 0.3 micronH14, PAO leak tested Recovery timeUnder 3 minutes2.4 minutes average Noise at 1.5 mUnder 55 dB(A)52 dB(A) Lighting on field40,000-160,000 LuxShadowless ring, adjustable Retrofit Versus New Build For existing theatres the ceiling can be installed in a weekend shutdown: the old ceiling grid is removed, the plenum hung from the structural slab through threaded rods, and the filter bank commissioned before Monday cases begin. For new builds the ceiling is designed together with the modular enclosure so that lighting, gas pendants and the laminar field share one structural plane without clashes. What Buyers Underestimate Three details decide whether a laminar ceiling actually works. First, the return air path: without low level returns positioned opposite each other, the clean curtain curls and the wound zone loses protection. Second, the filter bank gap: a 2mm gap between adjacent HEPA filters can drop zone cleanliness by a whole class. Third, the control logic: an alarm that only sounds at the panel is useless if nobody is in the plant room, so we wire it to the theatre display. Share your theatre ceiling height, table position and available plant room space, and we will size the plenum and return grilles for your room.
Read more
Lastest company news about Cleanroom And Operating Room Projects Now Ship With Complete DQ IQ OQ PQ Validation Documentation Package 2026/11/13
Cleanroom And Operating Room Projects Now Ship With Complete DQ IQ OQ PQ Validation Documentation Package
.gtr-container-x7k2m { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; font-size: 14px; line-height: 1.6; color: #2b2f26; max-width: 100%; box-sizing: border-box; } .gtr-container-x7k2m *, .gtr-container-x7k2m *::before, .gtr-container-x7k2m *::after { box-sizing: border-box; } .gtr-container-x7k2m .gtr-h2 { font-size: 18px; font-weight: bold; color: #4a6b12; margin: 0 0 14px 0; padding: 0 0 10px 0; border-bottom: 2px solid #96BF26; line-height: 1.4; } .gtr-container-x7k2m .gtr-h3 { font-size: 16px; font-weight: bold; color: #5c8217; margin: 26px 0 12px 0; padding: 0 0 0 10px; border-left: 4px solid #96BF26; line-height: 1.4; } .gtr-container-x7k2m .gtr-p { font-size: 14px; text-align: left; line-height: 1.6; margin: 0 0 14px 0; color: #2b2f26; } .gtr-container-x7k2m .gtr-list { list-style: none !important; margin: 0 0 16px 0; padding: 0; } .gtr-container-x7k2m .gtr-list > li { position: relative; padding: 8px 12px 8px 24px; margin: 0 0 8px 0; font-size: 14px; line-height: 1.6; text-align: left; border: 1px solid #e2e8d6; border-radius: 6px; background-color: #fafcf5; } .gtr-container-x7k2m .gtr-list > li::before { content: "•" !important; position: absolute !important; left: 10px !important; top: 8px; color: #96BF26; font-weight: bold; font-size: 14px; line-height: 1.6; } .gtr-container-x7k2m .gtr-list > li strong { color: #4a6b12; } .gtr-container-x7k2m .gtr-table-wrap { width: 100%; overflow-x: auto; margin: 0 0 18px 0; border-radius: 8px; border: 1px solid #d7e0c4; } .gtr-container-x7k2m table { width: 100%; border-collapse: collapse !important; border-spacing: 0 !important; font-size: 14px; margin: 0 !important; border: 1px solid #d7e0c4 !important; } .gtr-container-x7k2m table th, .gtr-container-x7k2m table td { border: 1px solid #d7e0c4 !important; padding: 10px 12px !important; text-align: left !important; vertical-align: top; line-height: 1.6; font-size: 14px; word-break: normal; overflow-wrap: break-word; } .gtr-container-x7k2m table th { background-color: #96BF26 !important; color: #ffffff !important; font-weight: bold; white-space: nowrap; } .gtr-container-x7k2m table tr:nth-child(even) td { background-color: #f6f9ee; } .gtr-container-x7k2m table tr:hover td { background-color: #eef4dd; } .gtr-container-x7k2m .gtr-p strong { color: #4a6b12; } @media (min-width: 768px) { .gtr-container-x7k2m .gtr-h2 { font-size: 18px; } .gtr-container-x7k2m .gtr-h3 { font-size: 16px; } .gtr-container-x7k2m .gtr-list > li { padding: 9px 16px 9px 26px; } .gtr-container-x7k2m .gtr-list > li::before { left: 12px !important; } .gtr-container-x7k2m table th, .gtr-container-x7k2m table td { padding: 12px 16px !important; } } The Paperwork Problem: Why Cleanrooms Fail Audits After They Pass Tests A cleanroom that measures clean but cannot prove it is clean will fail an audit. Regulators and hospital accreditation bodies want traceability: which filter was installed, when it was leak tested, who calibrated the gauge, what the particle count was at handover. YANING now ships every cleanroom and operating room project with a documentation package built alongside the equipment, not assembled afterwards. What Ships In The Handover Folder DQ, IQ, OQ, PQ templates - pre-filled with your equipment serial numbers, filter batch codes and instrument IDs Material certificates - EN 10204 3.1 for SS316L contact parts, panel core composition, gasket material data sheets Filter test records - individual HEPA serial number, efficiency scan result, PAO challenge date Calibration certificates - differential pressure gauges, velocity sensors, particle counters used during commissioning Commissioning test report - ISO 14644-1 classification, ISO 14644-3 tests, room pressure map, recovery time curves As-built drawings and O&M manual - including filter replacement schedule and alarm response flow chart Test Matrix Delivered With Each Project TestStandardAcceptance Airborne particle countISO 14644-1Class achieved at stated sample points HEPA integrityISO 14644-3 Annex BNo leak above 0.01% of upstream Airflow velocity and uniformityISO 14644-3 Annex CWithin +/-20% of design Room pressure differenceISO 14644-3 Annex DDesign value +/-2 Pa Recovery timeISO 14644-3 Annex ETarget class within stated minutes Lighting and noiseLocal hospital standard300-500 Lux, under 60 dB(A) Built For Both Pharma And Hospitals Pharmaceutical clients need cGMP alignment and EU GMP Annex 1 language in the qualification documents. Hospitals need accreditation-style evidence for theatre ventilation and infection control committees. The same template set is parameterised for both, so a distributor can hand a single folder to a pharma QA manager or a hospital engineering department and have it accepted without rework. Why We Build Documentation During Production Serial numbers, filter batch codes and panel certifications are captured at the factory, when the parts are on the bench. Reconstructing that trail six months later from photographs and emails is where audits fail. Our production order cannot be released to packing until the documentation checklist is complete, which is a simple control that removes an entire category of audit findings. Ask for a sample DQ IQ OQ PQ set and a commissioning report template with your quotation - we send the real documents, not marketing summaries.
Read more
Lastest company news about EC Fan FFU With Demand Based Control Cuts Cleanroom Energy Consumption By 32 Percent At Full Cleanliness Class 2026/11/13
EC Fan FFU With Demand Based Control Cuts Cleanroom Energy Consumption By 32 Percent At Full Cleanliness Class
Cutting Cleanroom Energy Cost By 32% With EC Fan FFU And Demand Based Control In a cleanroom, the FFU array and the chillers that serve it can consume forty to sixty percent of total facility electricity. Because most installations run at fixed maximum speed regardless of whether anyone is working, a large share of that energy is spent cleaning air for nobody. YANING's EC motor FFU combined with a pressure and particle based control layer cuts measured consumption by 32% on a 480 square meter electronics cleanroom, with no loss of cleanliness class. Where The Savings Come From MeasureConventional AC FFUEC FFU With Control Fan motor efficiency at 60% speedFixed, throttled by damperEC motor, 88% at partial load Night and weekend operationFull speedReduced to 30% airflow, class held Filter loading compensationManual speed increaseAutomatic pressure setpoint tracking Measured annual consumption212,000 kWh144,000 kWh Noise at 1 m58 dB(A)49 dB(A) The Control Logic, In Plain Terms Pressure cascade control - each zone holds its setpoint by trimming FFU speed instead of opening dampers Particle feedback - when counts stay below one tenth of the class limit, airflow is allowed to fall to the lowest validated value Occupancy scheduling - a seven day profile per zone, editable from a phone Filter life prediction - pressure trend slope estimates replacement date and raises a maintenance ticket Alarm escalation - deviations push to email and messaging, not just a plant room buzzer Keeping The Class While Saving Power The critical constraint is that a decrease in airflow must not lower the cleanliness class or break the pressure cascade. Our commissioning procedure first validates the lowest safe operating point with particle counting at reduced speed, then locks that value as the floor in the controller. Savings only happen above that floor, which is why the reduction is defensible to an auditor and repeatable across sites. What It Means For Operating Rooms Theatre suites run the same logic: full laminar flow during cases, reduced but still compliant airflow between cases with a boost triggered by the door sensor. Hospital engineering teams report that the night time baseline, not the surgical peak, is where the waste sits. Payback Reality Check On the 480 square meter reference project the control layer and EC fans added roughly eleven percent to the equipment budget and returned that premium within twenty-two months at an industrial tariff of 0.11 US dollars per kWh. Beyond payback, the filter life prediction stretched HEPA replacement from eighteen months to twenty-six months, because filters were changed on measured pressure rather than on a fixed calendar. Send us your existing FFU count, operating hours and electricity tariff and we will return an estimated annual saving with the control scheme needed to achieve it.
Read more
Lastest company news about Negative Pressure Isolation Rooms And Theatres Engineered With H14 Exhaust And Interlocked Pressure Cascade 2026/11/13
Negative Pressure Isolation Rooms And Theatres Engineered With H14 Exhaust And Interlocked Pressure Cascade
.gtr-container-x7k2m { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; font-size: 14px; line-height: 1.6; color: #2b2f26; max-width: 100%; box-sizing: border-box; } .gtr-container-x7k2m *, .gtr-container-x7k2m *::before, .gtr-container-x7k2m *::after { box-sizing: border-box; } .gtr-container-x7k2m .gtr-h2-x7k2m { font-size: 18px; font-weight: bold; color: #4a6113; line-height: 1.4; margin: 0 0 14px 0; padding: 0 0 10px 0; border-bottom: 2px solid #96BF26; text-align: left; } .gtr-container-x7k2m .gtr-h3-x7k2m { font-size: 16px; font-weight: bold; color: #5c7a17; line-height: 1.4; margin: 24px 0 10px 0; padding: 0 0 0 10px; border-left: 4px solid #96BF26; text-align: left; } .gtr-container-x7k2m p { font-size: 14px; line-height: 1.6; text-align: left; margin: 0 0 14px 0; color: #2b2f26; } .gtr-container-x7k2m strong { color: #3d5210; font-weight: bold; } .gtr-container-x7k2m ol { list-style: none !important; margin: 0 0 16px 0; padding: 0; } .gtr-container-x7k2m ol li { position: relative; padding: 8px 12px 8px 34px; margin: 0 0 8px 0; font-size: 14px; line-height: 1.6; text-align: left; color: #2b2f26; border-left: 3px solid #cfe39a; border-radius: 0 6px 6px 0; } .gtr-container-x7k2m ol li::before { content: counter(list-item) "." !important; position: absolute !important; left: 10px !important; top: 8px; font-weight: bold; color: #96BF26; font-size: 14px; } .gtr-container-x7k2m .gtr-table-wrap-x7k2m { width: 100%; overflow-x: auto; margin: 0 0 18px 0; border-radius: 8px; box-shadow: 0 1px 3px rgba(74, 97, 19, 0.12), 0 1px 2px rgba(74, 97, 19, 0.08); } .gtr-container-x7k2m table { width: 100%; border-collapse: collapse !important; border-spacing: 0 !important; border: 1px solid #cfe39a !important; font-size: 14px; line-height: 1.6; word-break: normal !important; overflow-wrap: break-word; } .gtr-container-x7k2m table th { background-color: #96BF26 !important; color: #ffffff !important; font-weight: bold !important; font-size: 14px !important; text-align: left !important; padding: 10px 12px !important; border: 1px solid #7fa01c !important; line-height: 1.5 !important; word-break: normal !important; } .gtr-container-x7k2m table td { padding: 10px 12px !important; border: 1px solid #dbe8b8 !important; text-align: left !important; vertical-align: top !important; color: #2b2f26 !important; font-size: 14px !important; line-height: 1.6 !important; word-break: normal !important; } .gtr-container-x7k2m table tr:nth-child(even) td { background-color: #f6f9ec !important; } .gtr-container-x7k2m table tr:hover td { background-color: #eef5d8 !important; } @media (min-width: 768px) { .gtr-container-x7k2m .gtr-h2-x7k2m { font-size: 18px; margin-bottom: 16px; } .gtr-container-x7k2m .gtr-h3-x7k2m { font-size: 16px; margin-top: 28px; } .gtr-container-x7k2m ol li { padding: 10px 16px 10px 38px; } .gtr-container-x7k2m ol li::before { left: 12px !important; top: 10px; } .gtr-container-x7k2m table th, .gtr-container-x7k2m table td { padding: 12px 16px !important; } } Negative Pressure Isolation Rooms: Engineering The Air Path That Stops An Outbreak Spreading When a patient with a suspected airborne infection is admitted, the room's pressure differential is the only barrier between their aerosol and the corridor. YANING builds negative pressure isolation rooms and negative pressure operating theatres as complete packages: airtight envelope, dedicated exhaust with H14 filtration, anteroom, interlocked doors and the alarm logic that makes a pressure failure visible within seconds. The Pressure Chain Corridor at ambient pressure, the reference point for the whole suite Anteroom at -10 Pa, the buffer where PPE is donned and doffed Isolation room at -20 to -30 Pa, the contaminated zone Ensuite bathroom at -35 Pa, the most negative point Air always flows from clean to dirty. Every door in the chain is interlocked so two cannot open at once, and the differential between adjacent zones is monitored rather than assumed. Technical Specification ItemSpecification Envelope airtightnessUnder 0.3 air changes per hour at 50 Pa leakage Exhaust filtrationH14 HEPA, 99.99% at 0.3 micron, bag-in bag-out option Air change rate12 ACH minimum, 15 ACH for high risk procedures Pressure monitoringRoom and anteroom gauges, 0-50 Pa, 1 Pa resolution Alarm logicVisual and audible at door, repeated at nurse station, pushed to BMS Door typeHermetic sliding or swing, interlocked, vision panel SealingContinuous gasket, sealed penetrations, no ceiling tile gaps Three Failure Modes We Design Out First, unsealed penetrations: a cable tray hole the size of a fist destroys a 30 Pa differential, so every service entry is gasketed and inspected with a smoke pencil at handover. Second, exhaust recirculation: if the exhaust discharge sits near an intake or an openable window, filtered air returns to the building, so discharge location is part of our design drawings. Third, alarm blindness: a gauge in an empty corridor protects nobody, so the signal is repeated at the point where staff actually stand. From Isolation Room To Whole Department The same engineering is applied to negative pressure operating theatres for infectious cases, to PCR and microbiology laboratories, and to pharmaceutical containment suites where potent compounds must not escape. Panels, doors, filters and controls come from one production line, which is why the pressure chain holds together at the joints where separate suppliers usually meet. Send us the room plan and the required pressure cascade and we will return an isolation suite design with airflow balance calculations and an alarm schedule.
Read more
Lastest company news about YANING Launches Real-Time Air Monitoring Modular Operating Room for ISO Class 5 Surgical Suites 2026/10/24
YANING Launches Real-Time Air Monitoring Modular Operating Room for ISO Class 5 Surgical Suites
YANING Launches Real-Time Air Monitoring Modular Operating Room for ISO Class 5 Surgical Suites YANING today introduced model YN-OR-MON-A5, a modular operating room that measures and logs air quality continuously instead of relying on periodic spot checks. The system combines a prefabricated wall and ceiling structure with HEPA H14 filtration and an integrated monitoring controller that reports differential pressure, temperature, humidity and particle counts to the surgeon control panel every five seconds. Continuous Verification Instead of Periodic Spot Checks Hospital engineering teams have traditionally verified operating theatre cleanliness during commissioning and annual re-qualification, leaving long intervals in which a drifting pressure differential or a partially loaded filter can go unnoticed. The YN-OR-MON-A5 closes that gap by treating air quality as a live measurement rather than a compliance document. Each room is delivered with calibrated sensors, configurable alarm thresholds and a twelve-month exportable trend record, so any deviation is time-stamped and traceable. Differential pressure, temperature, humidity and 0.3/0.5 micron particle counts refreshed every five seconds HEPA H14 filtration rated 99.995 percent at 0.3 micron, with per-filter pressure gauges and on-site DOP leak testing Audible and visual alarm plus SMS and BMS signal whenever a threshold is breached Twelve-month exportable logs for ISO 14644 re-qualification and accreditation review Built Around Surgical Workflow The room is delivered as prefabricated modules that arrive ready for assembly, keeping on-site installation to three to five days and limiting downtime in an existing theatre department. The laminar flow area of 2.4 by 2.4 metres provides a unidirectional air pattern across the surgical table at 0.25 to 0.35 metres per second, and the PLC controller exposes BACnet and Modbus data so the room can be supervised from a central building management system. Wall panels in 1.2 mm electrolytic steel with antibacterial coating and 50 mm polyurethane core 10-inch HMI touch screen with surgeon-facing status display and alarm acknowledgement 25 to 30 air changes per hour with an optional 100 percent fresh air configuration Remote access for facility managers reviewing room status from the engineering office Key Specifications Model YN-OR-MON-A5 Cleanliness ISO Class 5 (Class 100) Filtration HEPA H14, 99.995% at 0.3 micron Air Changes 25-30 ACH Laminar Flow Area 2.4 x 2.4 m Monitoring Points Pressure, temperature, humidity, particle count Control PLC with 10-inch HMI, BACnet/Modbus ready Wall Panel 1.2 mm electrolytic steel, 50 mm PU core Room Size Customized, minimum 3000 x 4000 x 2700 mm Power Supply 380V/220V, 50/60 Hz, three phase Availability and Delivery The YN-OR-MON-A5 is available now with a minimum order quantity of one set, priced from USD 18,000 to 45,000 per set depending on room dimensions, monitoring point count and fresh air configuration. Standard lead time is 20 to 30 working days after deposit and drawing confirmation, with air balancing, particle counting and IQ/OQ documentation included in the delivery scope. About YANING YANING is a manufacturer of modular operating room and hospital cleanroom systems based in Guangdong, China. The company supplies prefabricated wall and ceiling systems, hermetic doors, laminar flow ceilings, control panels and medical gas accessories, and delivers projects on a single-source basis covering design, production, installation and commissioning. YANING systems are CE marked and manufactured under ISO 9001:2015 and ISO 13485 quality management. Media and sales enquiries: Send your room layout, target ISO class and project schedule to our engineering team for a layout drawing and itemised quotation within 48 hours.
Read more
Lastest company news about YANING Releases Class A Fire Rated Hermetic Sliding Door for Hospital Operating Rooms 2026/10/24
YANING Releases Class A Fire Rated Hermetic Sliding Door for Hospital Operating Rooms
YANING Releases Class A Fire Rated Hermetic Sliding Door for Hospital Operating Rooms YANING has released model YN-HD-FA200, an automatic hermetic sliding door that carries a Class A fire rating while maintaining the airtight seal required by operating theatre pressure regimes. The door pairs a 2 mm steel leaf with a fire resistant core and a perimeter gasket, allowing one product to satisfy both fire compartmentation and cleanliness requirements. One Door for Two Compliance Requirements Operating theatre doors are usually specified twice on a hospital project: once by the fire consultant for compartmentation, and once by the cleanroom contractor for airtightness. Specifying two separate products creates coordination risk at the interface and often produces a door that leaks air around a seal designed only for smoke control. The YN-HD-FA200 addresses both duties in a single leaf and slide assembly. Class A fire rating with a documented test report accepted for hospital fire compartmentation and insurance review 2 mm steel skin over a fire resistant core, carried on a reinforced floor-mounted track Perimeter airtight and smoke tight gasket that holds room pressure differential for ISO Class 5 to 8 suites Adjustable opening speed of 200 to 600 mm per second with obstacle reverse and manual release for patient safety Shielding Option Extends the Specification The same platform is available with 2 mm lead equivalent shielding for X-ray and hybrid operating theatres, which means a hospital can standardise door hardware, spare parts and operator settings across an entire theatre department. Visual options include a double glazed observation window measuring 400 by 600 mm, and surfaces are offered in SS304 stainless steel or antibacterial powder coating in colours matched to the wall panel system. Optional 2 mm Pb equivalent lead shielding for X-ray, C-arm and hybrid operating rooms Built-in microcomputer operator with sensor activation and manual release on power failure Single leaf, double leaf and unequal leaf configurations for theatre and corridor openings SS304 or antibacterial powder coating in customised RAL colours Key Specifications Model YN-HD-FA200 Fire Rating Class A Leaf Thickness 2 mm steel skin with fire core Leaf Configuration Single, double, unequal leaf Opening Speed 200-600 mm/s adjustable Airtight Seal Inflatable or magnetic perimeter gasket Lead Shielding Optional 2 mm Pb equivalent Operator Microcomputer control, sensor activated Window Optional 400 x 600 mm double glazed Finish SS304 or antibacterial powder coating Availability and Delivery Model YN-HD-FA200 is available with a minimum order quantity of one set and pricing from USD 1,200 to 3,800 per set according to leaf configuration, shielding requirement and finish. Supply capability stands at 500 sets per month, with a lead time of 12 to 20 working days after drawing confirmation. About YANING YANING is a manufacturer of modular operating room and hospital cleanroom systems based in Guangdong, China. The company supplies prefabricated wall and ceiling systems, hermetic doors, laminar flow ceilings, control panels and medical gas accessories, and delivers projects on a single-source basis covering design, production, installation and commissioning. YANING systems are CE marked and manufactured under ISO 9001:2015 and ISO 13485 quality management. Media and sales enquiries: Send your opening schedule and fire strategy drawing to receive door shop drawings and an itemised quotation.
Read more
Lastest company news about YANING Releases CE Certified Turnkey Modular Operating Room Package for Single Source Delivery 2026/10/24
YANING Releases CE Certified Turnkey Modular Operating Room Package for Single Source Delivery
YANING Releases CE Certified Turnkey Modular Operating Room Package for Single Source Delivery YANING has released model YN-OR-TK-CE, a CE marked turnkey modular operating room package supplied as a single contract. The package covers wall and ceiling systems, hermetic doors, laminar flow ceiling, control panel and medical gas outlets, together with installation, commissioning and a single warranty, removing the coordination burden that normally sits with the hospital project manager. One Contract Instead of Six Suppliers Operating theatre fit-out typically splits across a cleanroom contractor, a door supplier, a medical gas contractor, an electrical contractor and a controls integrator. Every interface becomes a place where tolerances, delivery dates and responsibility can fail, and defects are frequently disputed between trades. Delivering the room as one package moves that risk to a single supplier with one acceptance test and one warranty document. CE marked system supplied with an EU declaration of conformity, ready for public tender submission Scope covering wall panels, ceiling, hermetic doors, laminar flow ceiling, control panel and medical gas outlets ISO Class 5 to 8 configurations matched to surgical discipline, infection control policy and budget level On-site commissioning with air balance, particle count and gas outlet test reports issued at handover Documentation Ready for Hospital Acceptance Hospital acceptance is a documentation exercise as much as a technical one. Each YN-OR-TK-CE delivery closes with an IQ/OQ package, as-built drawings, an operation and maintenance manual and a spare parts list, prepared in a format that commissioning engineers and accreditation auditors can review without further translation. Layout drawings and 3D renders are produced free of charge after a site survey, so clinical teams can approve room configuration before manufacture begins. Free layout drawing and 3D render returned within 48 hours of site survey 24-month equipment warranty plus 10-year structural warranty on the wall panel system Installation by YANING supervisor or a full turnkey crew, depending on site labour availability Design aligned with HTM and FGI guidance for operating theatre ventilation and finishes Key Specifications Model YN-OR-TK-CE Cleanliness Options ISO Class 5, 6, 7 and 8 Scope of Supply Full OR fit-out including MEP interfaces Design Service Layout drawing and 3D render included Installation Supervisor or full crew option Commissioning Air balance, particle count, pressure and gas test Documentation IQ/OQ, as-built drawings, O&M manual Warranty 24 months equipment, 10 years structure Compliance CE marked, HTM and FGI aligned Minimum Order One set Availability and Delivery The turnkey package is quoted from USD 25,000 to 80,000 per set depending on room count and configuration, with a supply capability of 20 sets per month. Lead time ranges from 25 to 40 working days according to the number of rooms and the level of on-site installation included. About YANING YANING is a manufacturer of modular operating room and hospital cleanroom systems based in Guangdong, China. The company supplies prefabricated wall and ceiling systems, hermetic doors, laminar flow ceilings, control panels and medical gas accessories, and delivers projects on a single-source basis covering design, production, installation and commissioning. YANING systems are CE marked and manufactured under ISO 9001:2015 and ISO 13485 quality management. Media and sales enquiries: Share your floor plan, room count and target accreditation standard to receive a turnkey proposal and programme.
Read more
Lastest company news about YANING Unveils Integrated Medical Gas Supply Surgical Control Panel with LCD Touch Screen 2026/10/24
YANING Unveils Integrated Medical Gas Supply Surgical Control Panel with LCD Touch Screen
YANING Unveils Integrated Medical Gas Supply Surgical Control Panel with LCD Touch Screen YANING has introduced model YN-OT-CP900, a flush mounted operating room console that consolidates medical gas monitoring, gas alarm annunciation and routine theatre controls on a single LCD touch screen. Driven by a Siemens PLC, the panel reports oxygen, nitrous oxide, carbon dioxide, medical air, vacuum, nitrogen and anaesthetic gas scavenging status from one interface instead of a row of separate gauges and boxes. Fewer Interfaces, Fewer Failure Points A conventional theatre wall carries gas pressure gauges, an alarm panel, a clock and timer, light dimming controls and an X-ray viewer switch, each from a different manufacturer with its own failure mode and spare part. Consolidating these functions into one factory wired console reduces terminations on site, cuts commissioning time and gives the surgical team a single place to look when a gas pressure alarm sounds. Medical gas monitoring for oxygen, nitrous oxide, carbon dioxide, air, vacuum, nitrogen and AGSS on one screen Siemens PLC controller exposing BACnet and Modbus data for direct integration with the hospital BMS Audible and visual alarm with a dry contact output to the nurse station and remote annunciator Surgery light dimming, clock, timer and X-ray viewer control from the same panel Configured to the Hospital Electrical Schedule Panel layout, engraving and alarm hierarchy are configured per project, so the console matches the hospital electrical schedule and the department naming convention rather than forcing a standard layout on the clinical team. The front face is available in SS304 stainless steel or antibacterial coated steel, rated IP44 and suitable for wipe-down disinfection with standard hospital detergents. Custom panel layout, labelling and gas channel count per room duty SS304 or antibacterial coated steel face with IP44 protection AC 220 V supply with 24 V DC control circuit for safe maintenance access 10-inch and 15-inch screen options for standard theatres and hybrid suites Key Specifications Model YN-OT-CP900 Screen 10-inch or 15-inch industrial LCD touch Controller Siemens PLC, BACnet and Modbus Gas Channels O2, N2O, CO2, Air, Vacuum, N2, AGSS Alarm Audible and visual with dry contact output Panel Material SS304 or antibacterial coated steel Protection IP44 front face Mounting Flush wall mounted Power Supply AC 220V, 24V DC control circuit Minimum Order One set Availability and Delivery Model YN-OT-CP900 is available from USD 900 to 4,500 per set depending on screen size and gas channel count, with a supply capability of 300 sets per month. Lead time is 10 to 18 working days after panel layout confirmation. About YANING YANING is a manufacturer of modular operating room and hospital cleanroom systems based in Guangdong, China. The company supplies prefabricated wall and ceiling systems, hermetic doors, laminar flow ceilings, control panels and medical gas accessories, and delivers projects on a single-source basis covering design, production, installation and commissioning. YANING systems are CE marked and manufactured under ISO 9001:2015 and ISO 13485 quality management. Media and sales enquiries: Send your medical gas schematic and room schedule to receive a panel layout and quotation.
Read more
Lastest company news about YANING Launches Anti Corrosion Seamless Interlocking Operating Room Wall Panel System 2026/10/24
YANING Launches Anti Corrosion Seamless Interlocking Operating Room Wall Panel System
YANING Launches Anti Corrosion Seamless Interlocking Operating Room Wall Panel System YANING has launched model YN-WP-AC50, an operating room wall panel built around a 1.2 mm electrolytic steel skin with silver ion antibacterial coating, assembled on a seamless interlocking aluminium joint system. The panel was developed after field reports that wall finishes in theatres were failing at joints and along high-touch surfaces, in rooms where walls are disinfected several times per shift. Engineered for Daily Disinfection Operating theatre walls are exposed to alcohol, chlorine, hydrogen peroxide and quaternary ammonium compounds on a daily basis. Standard coated panels can chalk, blister or discolour within two to three years under that regime, and joint sealant can become a harbour for microbial growth. The YN-WP-AC50 addresses both the surface and the joint, with a salt spray rating of 500 hours and a chemical resistance profile tested against the four disinfectant families used in most hospitals. 500 hours neutral salt spray corrosion resistance for long service under daily disinfection Silver ion antibacterial coating with an above 99 percent reduction rate against E. coli and S. aureus Seamless interlocking aluminium joint system that removes dirt traps at panel interfaces Class A fire rated 50 mm polyurethane core at 40 kg per cubic metre density Finishes That Match Hospital Interiors Panels are available in matte, gloss and wood grain finishes with RAL colour matching, so the theatre department can be coordinated with corridors, recovery bays and staff areas without switching panel systems. Standard panels measure up to 1200 by 3000 mm and are supplied knock-down on steel pallets with edge protection and a moisture barrier wrap for sea freight. Custom RAL colours and wood grain finishes for interior design coordination Optional 75 mm and 100 mm thicknesses for acoustic or fire separation requirements Panels supplied knock-down for container efficiency and reduced freight cost Compatible with YANING hermetic doors, ceiling plenums and control consoles Key Specifications Model YN-WP-AC50 Panel Thickness 50 mm standard, 75 and 100 mm optional Surface 1.2 mm electrolytic steel with silver ion coating Core PU foam 40 kg/m3 Joint System Seamless interlocking aluminium profile Salt Spray 500 hours neutral salt spray passed Chemical Resistance Alcohol, chlorine, hydrogen peroxide, quaternary ammonium Antibacterial Rate Above 99 percent Fire Rating Class A Maximum Panel Size 1200 x 3000 mm Availability and Delivery Model YN-WP-AC50 is available from USD 28 to 55 per square metre with a minimum order quantity of 50 square metres. Supply capability is 20,000 square metres per month, and lead time runs 10 to 18 working days after colour and layout confirmation. About YANING YANING is a manufacturer of modular operating room and hospital cleanroom systems based in Guangdong, China. The company supplies prefabricated wall and ceiling systems, hermetic doors, laminar flow ceilings, control panels and medical gas accessories, and delivers projects on a single-source basis covering design, production, installation and commissioning. YANING systems are CE marked and manufactured under ISO 9001:2015 and ISO 13485 quality management. Media and sales enquiries: Request a panel sample and a project material take-off based on your drawings.
Read more
Lastest company news about Modular Cleanroom Project Demand Surges as Pharma and Semiconductor Capacity Expands in 2026 2026/10/10
Modular Cleanroom Project Demand Surges as Pharma and Semiconductor Capacity Expands in 2026
.gtr-container-xyz123 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 15px; box-sizing: border-box; } .gtr-container-xyz123 h3 { font-size: 18px; font-weight: bold; color: #96BF26; margin-top: 25px; margin-bottom: 15px; padding-bottom: 5px; border-bottom: 1px solid #e0e0e0; } .gtr-container-xyz123 p { font-size: 14px; margin-bottom: 15px; text-align: left !important; } .gtr-container-xyz123 ul { list-style: none !important; padding: 0; margin: 0 0 15px 0; } .gtr-container-xyz123 ul li { font-size: 14px; position: relative; padding-left: 20px; margin-bottom: 8px; text-align: left !important; list-style: none !important; } .gtr-container-xyz123 ul li::before { content: "•" !important; color: #96BF26 !important; position: absolute !important; left: 0 !important; font-size: 18px; line-height: 1; } .gtr-container-xyz123 table { width: 100% !important; border-collapse: collapse !important; margin-bottom: 20px !important; border: 1px solid #d0d0d0 !important; } .gtr-container-xyz123 th, .gtr-container-xyz123 td { padding: 12px 15px !important; border: 1px solid #d0d0d0 !important; text-align: left !important; vertical-align: top !important; font-size: 14px !important; word-break: normal !important; overflow-wrap: normal !important; } .gtr-container-xyz123 th { background-color: #eaf2d7 !important; font-weight: bold !important; color: #333 !important; } .gtr-container-xyz123 tr:nth-child(even) { background-color: #f9f9f9 !important; } .gtr-container-xyz123 .gtr-table-wrapper { overflow-x: auto; margin-bottom: 20px; } @media (min-width: 768px) { .gtr-container-xyz123 { padding: 25px; } .gtr-container-xyz123 h3 { font-size: 20px; margin-top: 30px; margin-bottom: 20px; } .gtr-container-xyz123 p { font-size: 14px; } .gtr-container-xyz123 ul li { font-size: 14px; } } Modular Cleanroom Project Demand Surges as Pharma and Semiconductor Capacity Expands Global investment in pharmaceutical manufacturing, biotechnology, semiconductor fabrication and food processing is accelerating — and so is the demand for high-performance cleanroom projects. Through 2026, cleanroom construction spending has continued to climb as companies expand production capacity and comply with tightening contamination-control regulations. For facility owners and general contractors, the real question is no longer whether to build a cleanroom, but how to deliver it faster, at lower cost and to a higher standard of cleanliness. Why Cleanroom Demand Is Rising Three structural forces are driving the surge in cleanroom projects worldwide: Pharmaceutical and biotech expansion: growing demand for sterile injectables, biologics and vaccines requires GMP-grade cleanrooms with reliable air filtration. Semiconductor and electronics growth: chip fabs and precision electronics assembly depend on ultra-low particle environments to protect production yield. Food, cosmetics and healthcare regulation: stricter hygiene standards are pushing manufacturers toward fully controlled environments. The result is a market in which cleanroom capacity is a competitive asset. Companies that can bring compliant space online quickly win contracts; those that cannot fall behind. That urgency is precisely what is pushing buyers away from slow, disruptive construction methods and toward modular solutions. Modular vs. Traditional Stick-Built Cleanrooms Modular cleanroom systems are increasingly replacing traditional stick-built construction because they shorten delivery time and reduce onsite disruption. Factor Traditional Build Modular Cleanroom Typical delivery time 12–20 weeks 4–8 weeks Onsite labor High Low, factory-prefabricated Future expansion Difficult Highly flexible Quality consistency Site-dependent Controlled factory production Matching Equipment to Cleanroom Class Cleanroom performance is defined by ISO 14644 classes, ranging from ISO 5 (the strictest, used for critical pharmaceutical and surgical areas) to ISO 8 (general controlled zones). Each class requires a specific equipment configuration: air showers at personnel entry, pass boxes for material transfer, FFU fan filter units and HEPA filter boxes for air supply, and ventilation grilles for return airflow. Choosing the right combination is the difference between a cleanroom that passes validation at the first attempt and one that does not. Key Decisions When Planning a Cleanroom Project Target cleanliness class and the process steps it must protect Personnel and material flow to avoid cross-contamination Air change rate and pressure cascade between zones Energy consumption and long-term running cost Validation and documentation requirements for regulators One Supplier, A Complete Cleanroom Project YANING, based in Dongguan, China, has manufactured cleanroom and operating room equipment for more than 19 years, serving over 5,000 customers with an 80–90% export share. From cleanroom air showers and dynamic pass boxes to FFU fan filter units, HEPA filter boxes and ventilation grilles, YANING supplies the full equipment stack for a modular cleanroom project, supported by layout design, installation guidance and validation documentation. For buyers planning a 2026 cleanroom build, a single accountable supplier means consistent quality, simpler logistics and a faster route to commissioning.
Read more
1 2 3 4 5 6 7