Cleanroom and operating room projects usually fail at the seams, not in the middle. The panel supplier blames the HVAC contractor, the HVAC contractor blames the FFU vendor, and the hospital or pharma client ends up coordinating four companies in three languages while the commissioning date slips. YANING now delivers cleanrooms and operating rooms as a single turnkey package: one contract, one project manager, one commissioning report.
| Phase | Duration | Deliverable |
|---|---|---|
| Design and 3D proposal | 3-5 days | Layout drawings, equipment schedule, quotation |
| Panel and equipment production | 18-25 days | Numbered panels, doors, FFU, filters, controls |
| Shipping | 7-20 days | Container loading plan, packing list, customs documents |
| Erection | 10-15 days | Enclosure complete, doors aligned, lighting live |
| Commissioning | 3-5 days | Test report, as-built drawings, O&M manual |
Pharmaceutical clients need a single responsible party for GMP documentation. Hospital groups need one warranty contact when a pressure alarm triggers at 2 a.m. Distributors need a supplier who can quote a full operating room suite instead of selling panels by the square meter. The turnkey model removes the interface risk that usually sits with the buyer.
Every project handover includes a signed interface matrix covering eleven boundaries: panel to floor, panel to ceiling grid, door to wall, FFU to duct, filter box to ceiling, air shower to partition, pass box to wall, medical gas outlet to panel, light to ceiling, sensor to controller, and controller to building management system. If a boundary is not listed, it is not a hidden extra.
Send us a floor plan or even a hand sketch, and our engineering team will return a pressure cascade scheme, an equipment list and a budget range within one working day. That is the fastest way to test whether a one-stop partner fits your project.