Product Details
Place of Origin: Guangdong, China
Brand Name: YN
Certification: CE, ISO 14644, RoHS
Model Number: YN-ASKD1600
Payment & Shipping Terms
Minimum Order Quantity: 1 Set
Price: USD 1,900-4,200 / Set
Packaging Details: PE film wrapped, plywood export case with fumigation-free packing
Delivery Time: 15-25 working days after deposit
Payment Terms: T/T,L/C at sight,Western Union,L/C,D/A,D/P
Supply Ability: 30 Sets per Month
Structure: |
Knock Down Modular Panels With Bolted Aluminum Profile Frame |
Material: |
SUS304 Stainless Steel Panel, 1.0mm, Or Powder Coated Steel Option |
Air Velocity: |
25 M/s At Nozzle, 24 Pcs Adjustable Nozzles |
Filtration: |
H13 HEPA 99.99% @ 0.3 Micron + G4 Pre-filter |
Installation: |
Bolt Together Assembly, About 2 Hours With 2 Workers, No Welding |
Shipping Volume: |
Flat Packed, 1 Set Fits A 20GP Container With Accessories |
Door: |
Double Door With Electronic Interlock |
Control: |
PLC Panel Pre-wired, Plug And Play Terminal Blocks |
Options: |
Cargo Tunnel Extension, Three Side Blowing, Automatic Sliding Door |
Power Supply: |
AC 220V / 380V, 50/60Hz |
Structure: |
Knock Down Modular Panels With Bolted Aluminum Profile Frame |
Material: |
SUS304 Stainless Steel Panel, 1.0mm, Or Powder Coated Steel Option |
Air Velocity: |
25 M/s At Nozzle, 24 Pcs Adjustable Nozzles |
Filtration: |
H13 HEPA 99.99% @ 0.3 Micron + G4 Pre-filter |
Installation: |
Bolt Together Assembly, About 2 Hours With 2 Workers, No Welding |
Shipping Volume: |
Flat Packed, 1 Set Fits A 20GP Container With Accessories |
Door: |
Double Door With Electronic Interlock |
Control: |
PLC Panel Pre-wired, Plug And Play Terminal Blocks |
Options: |
Cargo Tunnel Extension, Three Side Blowing, Automatic Sliding Door |
Power Supply: |
AC 220V / 380V, 50/60Hz |
Overseas cleanroom projects lose money on freight volume and on-site labor. This knock down modular air shower is delivered as flat panels with a bolted aluminum profile frame, so several units fit into one container and the chamber is assembled on site in about two hours without welding.
| Structure | Knock down bolted panels |
|---|---|
| Material | SUS304 1.0mm or powder coated steel |
| Air velocity | 25 m/s, 24 nozzles |
| Filter | H13 HEPA 99.99% @ 0.3 micron |
| Assembly | About 2 hours, no welding |
| Shipping | Flat pack, fits 20GP container |
| Interlock | Electronic double door |
| Power | AC 220V/380V 50/60Hz |
Customized sizes, blowing directions and control configurations are available. Send us your cleanroom layout drawing for a tailored solution and quotation.